The Full Guide to Your DNO Solar Application

  • If your solar photovoltaic system has a capacity of 3.68 kilowatts peak or higher, you'll need to submit an application to the Distribution Network Driver (DNO).
  • There are 2 various types of applications
  • Discovering the best installer is crucial to getting through the DNO application process

When you're preparing to have photovoltaic panels set up at your home there's great deals to take into consideration. Just how much will the solar panels set you back? Which installer should you make use of? The number of panels should you go with?

Another point you might not have actually thought about is whether you need to send a DNO application. Not all photovoltaic panel projects need to send an application before setup, nonetheless if your solar PV system exceeds 3.68 kWp of ability after that you'll require consent.

This guide consists of everything you require to understand about DNO applications, from how to find out if you'll need one to a detailed approach to completing one. Your solar panel installer ought to be able to lead you via the process, so it's crucial you discover a good and trustworthy one.

If you need to know just how much it'll cost you to get photovoltaic panels mounted, just enter a few details in our short form. Our specialist installers make it easy by returning to you straight with bespoke quotes.

What is a District Network Operator (DNO)?

A DNO is the power distributor giving power to your home. They are responsible for keeping the electrical energy high-voltage line, both below ground and expenses. Unlike a power provider such as EDF or OVO Power, DNOs manage the network infrastructure itself and provide the electrical power to homes.

The UK is split right into 14 distinctive regional networks, each of which is managed by a Circulation Network Operator (DNO). While some DNOs are accountable for handling several networks, there are currently 6 DNOs operating throughout the country.

Examples of DNOs in the UK consist of Northern Ireland Power, UK Power Networks and Western Power Distribution.

To figure out who your regional DNO is, complete the Power Network Association's postcode checker.

What is a DNO application and why is it vital?

If you have set up photovoltaic panels on your home and they are producing power, you need to let your regional DNO recognize. The size of your solar installment (above or listed below 3.68 kWp) establishes whether you require to make a DNO application prior to any type of work is performed.

This is because the DNO has to monitor variations in the power grid. Any overload in the regional grid can create concerns, even so much as tripping out the network! As DNOs are responsible for keeping the grid's infrastructure, they need to be alerted of your solar panels through an application. Your solar installer will usually have the ability to suggest and take care of your application for you.

Additionally, if you don't complete a DNO application, you will not be eligible for Smart Export Assurance (SEG) settlements for excess energy your solar panels might create, which can be sold directly to an electricity vendor.

Is it required to complete a DNO application for photovoltaic panels?

UK federal government guidance states that property owners must educate their regional DNO if they plan to set up a power device on their building, including solar PV, that connects right into the neighborhood power grid.

In the event that your planetary system goes beyond 3.68 kWp, the single option to prevent needing a DNO application is if you intend to have your solar power entirely independent from the nationwide electricity grid. This involves linking it exclusively to your home without any connection to the UK's electrical energy system. Nevertheless, it is uncommon for people to select this choice because of the substantial costs entailed, in addition to the lack of electrical energy supply throughout wintertime.

Two groups of applications, G98 and G99, exist based on the photovoltaic panel dimension. A lot more documents is needed for bigger systems' applications compared to smaller setups.

Just how to complete your DNO application

Good news! Your solar installer can take care of the DNO application on your behalf. To make sure a smooth application procedure, there are numerous actions that require to be completed. The primary step is to confirm that your solar installer has the required certifications.

Firstly, it's actually crucial to ensure you involve a photovoltaic panel installer that is registered with an appropriate certification plan.

Verify whether the installer you intend to utilize is connected with a Competent Folks Plan or a certified company like the Microgeneration Accreditation Plan (MCS). Although enrollment is voluntary for installers, it allows them to state that their job abides by nationwide structure laws by self-certifying their compliance.

Always request evidence of certification prior to agreeing for any job to be carried out on your building.
Action 2-- Identify whether the DNO application should be submitted BEFORE or AFTER installment

Once you have actually obtained a certified contractor in position to mount your solar PV, they will certainly be able to encourage whether you need to notify the DNO before or after the panels are in area.

After mounting photovoltaic panels, a 'link and inform' method permits the DNO application procedure to take place. This involves submitting a G98 application form within 28 days of the solar panels being mounted, and applies to smaller sized solar PV systems with an ability of under 3.68 kWp.

'Relate to link' is for larger setups surpassing 3.68 kWp and requires a G99 application. This is because the DNO will certainly require to check whether the grid is able to take the additional electrical power lots before your system is up and running.

If you submit an 'apply to attach' DNO application, it can occupy to 11 weeks for your approval to find through, so strategy beforehand in order to not hold up your solar installment.

Action 3-- Install the solar PV and make sure the installation is signed up

Once the solar panels remain in location, your installer requires to alert either their qualified individuals plan or various other accreditation system.

As the gadget owner, you are responsible for making sure that your installer has actually alerted the pertinent DNO of the solar PV installment being full-- and if it was an 'relate to link' task, that it was given authorisation before the job was carried out.

Step 4-- Await your documents to come through

The installer you choose will provide you all the called for documents for your solar PV system, including:

Building Regulations Conclusion Certification-- you'll require this if you ever before offer your building.
Installment certification (offered directly by the installer)

Step 5-- Put On the Smart Export Assurance (SEG) Plan

Anyone with a solar PV installment of approximately 5MW (megawatts) in Britain can relate to the SEG system which permits them to get payments for electricity they export to the grid. Ofgem offers suggestions on exactly how to join the system.

Do you need to do a DNO application for a storage battery installment?

If you're setting up a battery storage system along with your solar PV, you will likewise require a DNO application. The procedure coincides when it comes to solar panels as outlined above and again, your installer will certainly be able to direct you.

Can a DNO application be rejected?

If the neighborhood power grid does not have sufficient capability to manage the additional power generated by your photovoltaic panels, there might be added actions needed for your applications. One opportunity is that the Distribution Network Driver (DNO) can restrict the quantity of power you can export. This would certainly include setting up an export monitoring system and paying a tiny charge to adhere to the DNO's regulations.

If the existing electrical energy framework in the location can not fit the excess energy generated by renewable sources, significant investments might be essential to upgrade the grid. This can require a substantial economic worry.

Moving on

Prior to you begin the process of installing photovoltaic panels on your home, it's vital to find a good, certified installer who can guide you with the DNO application procedure.

There's not much point mounting photovoltaic panels on your home if they can't be connected right into the local electrical energy network! Utilize our online type to begin the process and obtain a totally free quote for solar panels.

Wish to obtain a head start on your solar panel project? Figure out how much it'll cost you to obtain photovoltaic panels set up by entering a couple of details in our short form. Our expert installers will certainly then contact complimentary bespoke quotes.

VAT: GB-396048367
Co Reg: 13588844

Head Office:
158a Beechwood Road, Luton, England, LU4 9RY

Home Efficient Ltd is an Introducer Appointed Representative (Financial Services Register No. 1004122) of Phoenix Financial Consultants Limited (Phoenix). Phoenix is a credit broker, not a lender. Phoenix is authorised and regulated by the Financial Conduct Authority (FRN: 539195), and offers finance from its panel of lenders. All finance subject to status and credit checks.
×